Triple
T7996642
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Gadeokdo New Airport area (national project vicinity) |
E186143
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | infrastructure development zone |
C23362
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: infrastructure development zone Context triple: [Gadeokdo New Airport area (national project vicinity), instanceOf, infrastructure development zone]
-
A.
economic and technological development zone
An economic and technological development zone is a designated area where governments concentrate infrastructure, incentives, and regulatory support to attract investment, foster industrial innovation, and accelerate regional economic growth.
-
B.
development corridor
A development corridor is a strategically planned geographic area, often aligned along major transportation routes, where concentrated investment in infrastructure, industry, and services is used to stimulate economic growth and regional integration.
-
C.
infrastructure developer
An infrastructure developer designs, builds, and maintains the underlying systems, tools, and automation that support reliable, scalable, and secure software deployment and operations.
-
D.
infrastructure project
An infrastructure project is a large-scale, organized effort to plan, design, and construct foundational physical systems—such as transportation, utilities, and public facilities—that support a community’s or region’s economic and social activities.
-
E.
special economic zone
A special economic zone is a designated geographic area within a country where business and trade laws differ from the rest of the nation to attract investment, boost exports, and stimulate economic growth.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca829c6c308190ab05b43d234c52b2 |
completed | March 30, 2026, 2:03 p.m. |
Created at: March 30, 2026, 5:17 p.m.