Triple
T7996489
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Amsterdam bridge network |
E186139
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | urban infrastructure system |
C3206
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: urban infrastructure system Context triple: [Amsterdam bridge network, instanceOf, urban infrastructure system]
-
A.
public transportation infrastructure
Public transportation infrastructure encompasses the physical and organizational systems—such as buses, trains, stations, tracks, and supporting facilities—that enable the efficient movement of people via shared transit services.
-
B.
transport infrastructure network
A transport infrastructure network is an interconnected system of physical routes and facilities—such as roads, railways, ports, and airports—designed to enable the efficient movement of people and goods across regions.
-
C.
infrastructure
chosen
Infrastructure is the foundational physical and organizational systems—such as transportation, utilities, communication networks, and public facilities—that enable a society or organization to function and grow.
-
D.
urban beltway
An urban beltway is a high-capacity circumferential highway or roadway system that encircles a city to route traffic around its core, reduce congestion, and connect radial routes and suburbs.
-
E.
road infrastructure
Road infrastructure encompasses the physical structures, systems, and facilities—such as roads, bridges, tunnels, signage, and drainage—designed and built to support safe and efficient vehicular and pedestrian transportation.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca829c6c308190ab05b43d234c52b2 |
completed | March 30, 2026, 2:03 p.m. |
Created at: March 30, 2026, 5:17 p.m.