Triple

T7994291
Position Surface form Disambiguated ID Type / Status
Subject Salto Grande Dam E186083 entity
Predicate hasPart P35 FINISHED
Object Salto Grande Hydroelectric Power Plant E186083 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Salto Grande Hydroelectric Power Plant | Statement: [Salto Grande Dam, hasPart, Salto Grande Hydroelectric Power Plant]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Salto Grande Hydroelectric Power Plant
Context triple: [Salto Grande Dam, hasPart, Salto Grande Hydroelectric Power Plant]
  • A. Comahue hydroelectric complex
    The Comahue hydroelectric complex is a major system of dams and power plants in Argentina’s Comahue region that harnesses the flow of rivers such as the Limay to generate electricity.
  • B. Salto Grande Dam chosen
    Salto Grande Dam is a large hydroelectric dam and binational power station on the Uruguay River, jointly operated by Argentina and Uruguay.
  • C. Yacyretá Dam
    The Yacyretá Dam is a large hydroelectric power plant on the border between Argentina and Paraguay that generates electricity by harnessing the flow of the Paraná River.
  • D. Maria Cristina Hydroelectric Plant
    The Maria Cristina Hydroelectric Plant is a major hydroelectric power facility in the Philippines, known for harnessing the Maria Cristina Falls to supply electricity to Mindanao.
  • E. Itaipu Dam
    Itaipu Dam is a massive hydroelectric power plant on the Brazil–Paraguay border, once the world’s largest in installed capacity and still one of the most important sources of renewable energy in South America.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca829c6c308190ab05b43d234c52b2 completed March 30, 2026, 2:03 p.m.
NER Named-entity recognition batch_69cb3c73ba388190bcedc29fbdd22f3c completed March 31, 2026, 3:16 a.m.
NED1 Entity disambiguation (via context triple) batch_69cbe105d400819096ba271416bb24e7 completed March 31, 2026, 2:58 p.m.
Created at: March 30, 2026, 5:16 p.m.