Triple
T7994276
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Salto Grande Dam |
E186083
|
entity |
| Predicate | operator |
P179
|
FINISHED |
| Object |
Comisión Técnica Mixta de Salto Grande
La Comisión Técnica Mixta de Salto Grande es el organismo binacional argentino-uruguayo encargado de la gestión, administración y aprovechamiento integral del complejo hidroeléctrico de Salto Grande sobre el río Uruguay.
|
E186083
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Comisión Técnica Mixta de Salto Grande | Statement: [Salto Grande Dam, operator, Comisión Técnica Mixta de Salto Grande]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Comisión Técnica Mixta de Salto Grande Context triple: [Salto Grande Dam, operator, Comisión Técnica Mixta de Salto Grande]
-
A.
Salto
Salto is a major city in northwestern Uruguay known for its hot springs, agriculture, and position as a key regional center near the Argentine border.
-
B.
Yacyretá Dam
The Yacyretá Dam is a large hydroelectric power plant on the border between Argentina and Paraguay that generates electricity by harnessing the flow of the Paraná River.
-
C.
Salto Grande Dam
Salto Grande Dam is a large hydroelectric dam and binational power station on the Uruguay River, jointly operated by Argentina and Uruguay.
-
D.
Hidroituango hydroelectric project
The Hidroituango hydroelectric project is a major dam and power plant development in Colombia, designed to be the country’s largest source of hydroelectric energy.
-
E.
Puerto Iguazú
Puerto Iguazú is an Argentine border city in Misiones Province known as a major gateway for tourists visiting the nearby Iguazu Falls and the tri-border area with Brazil and Paraguay.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Comisión Técnica Mixta de Salto Grande Triple: [Salto Grande Dam, operator, Comisión Técnica Mixta de Salto Grande]
Generated description
La Comisión Técnica Mixta de Salto Grande es el organismo binacional argentino-uruguayo encargado de la gestión, administración y aprovechamiento integral del complejo hidroeléctrico de Salto Grande sobre el río Uruguay.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Comisión Técnica Mixta de Salto Grande Target entity description: La Comisión Técnica Mixta de Salto Grande es el organismo binacional argentino-uruguayo encargado de la gestión, administración y aprovechamiento integral del complejo hidroeléctrico de Salto Grande sobre el río Uruguay.
-
A.
Salto
Salto is a major city in northwestern Uruguay known for its hot springs, agriculture, and position as a key regional center near the Argentine border.
-
B.
Yacyretá Dam
The Yacyretá Dam is a large hydroelectric power plant on the border between Argentina and Paraguay that generates electricity by harnessing the flow of the Paraná River.
-
C.
Salto Grande Dam
chosen
Salto Grande Dam is a large hydroelectric dam and binational power station on the Uruguay River, jointly operated by Argentina and Uruguay.
-
D.
Hidroituango hydroelectric project
The Hidroituango hydroelectric project is a major dam and power plant development in Colombia, designed to be the country’s largest source of hydroelectric energy.
-
E.
Puerto Iguazú
Puerto Iguazú is an Argentine border city in Misiones Province known as a major gateway for tourists visiting the nearby Iguazu Falls and the tri-border area with Brazil and Paraguay.
- F. None of above.
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca829c6c308190ab05b43d234c52b2 |
completed | March 30, 2026, 2:03 p.m. |
| NER | Named-entity recognition | batch_69cb3c73ba388190bcedc29fbdd22f3c |
completed | March 31, 2026, 3:16 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69cbe105d400819096ba271416bb24e7 |
completed | March 31, 2026, 2:58 p.m. |
| NEDg | Description generation | batch_69cbe440a66c8190a5d5b417fb5082b7 |
completed | March 31, 2026, 3:12 p.m. |
| NED2 | Entity disambiguation (via description) | batch_69cc338a1c48819086ece073e04e8fa6 |
completed | March 31, 2026, 8:50 p.m. |
Created at: March 30, 2026, 5:16 p.m.