Triple
T7984140
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | 211工程 |
E185647
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | 中国高等教育建设工程 |
C11190
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: 中国高等教育建设工程 Context triple: [211工程, instanceOf, 中国高等教育建设工程]
-
A.
Chinese higher education development initiative
chosen
A Chinese higher education development initiative is a coordinated policy and investment program aimed at expanding, improving, and internationalizing China’s universities and colleges to support national economic, technological, and social development goals.
-
B.
Chinese government higher education initiative
A Chinese government higher education initiative is a state-led program or policy designed to expand, improve, and strategically align universities and colleges with national development, innovation, and global competitiveness goals.
-
C.
college of Tsinghua University
A college of Tsinghua University is an academic unit within the university that organizes related disciplines, manages faculty and students, and oversees teaching, research, and degree programs in its specialized fields.
-
D.
engineering institute
An engineering institute is an educational and research organization dedicated to teaching, advancing, and applying engineering principles and technologies across various specialized fields.
-
E.
public polytechnic university
A public polytechnic university is a state-funded higher education institution that emphasizes applied sciences, engineering, technology, and professional fields through hands-on, career-oriented programs and research.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca829a2cfc819083d591d58ec04075 |
completed | March 30, 2026, 2:03 p.m. |
Created at: March 30, 2026, 5:15 p.m.