Triple

T797673
Position Surface form Disambiguated ID Type / Status
Subject Green Line (CTA) E17058 entity
Predicate partOfNetwork P840 FINISHED
Object CTA rail system E15398 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: CTA rail system | Statement: [Green Line (CTA), partOfNetwork, CTA rail system]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: CTA rail system
Context triple: [Green Line (CTA), partOfNetwork, CTA rail system]
  • A. Metra
    Metra is the commuter rail system serving the Chicago metropolitan area, operating extensive routes that connect the city with its surrounding suburbs.
  • B. CTA Red Line
    The CTA Red Line is a major rapid transit route in Chicago that runs north–south through the city, including service through the downtown Loop.
  • C. Chicago "L" chosen
    The Chicago "L" is the elevated rapid transit system serving Chicago and some surrounding suburbs, known for its iconic above-ground tracks and extensive urban rail network.
  • D. Metra Electric District line
    The Metra Electric District line is a commuter rail line in the Chicago metropolitan area that runs from downtown Chicago to its southern suburbs, serving key destinations along the South Side and beyond.
  • E. CTA Orange Line
    The CTA Orange Line is a Chicago 'L' rapid transit route that runs between the Loop and Midway International Airport, serving the city's Southwest Side.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a49378b9c48190adbf5f62e5b7aca1 completed March 1, 2026, 7:28 p.m.
NER Named-entity recognition batch_69a4a7b342888190a344fe81a2c9f33c completed March 1, 2026, 8:55 p.m.
NED1 Entity disambiguation (via context triple) batch_69a7a3b1a81481908c831d1f43b9d014 completed March 4, 2026, 3:14 a.m.
Created at: March 1, 2026, 7:38 p.m.