Triple

T7971588
Position Surface form Disambiguated ID Type / Status
Subject Harmony Borax Works E185334 entity
Predicate instanceOf P0 FINISHED
Object borax processing plant C4822 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: borax processing plant
Context triple: [Harmony Borax Works, instanceOf, borax processing plant]
  • A. uranium processing facility
    A uranium processing facility is an industrial plant where uranium ore is refined, converted, and prepared into nuclear-grade materials for use in fuel production or other nuclear applications.
  • B. industrial plant chosen
    An industrial plant is a large-scale facility where raw materials are transformed through mechanical, chemical, or biological processes into finished or semi-finished products using specialized equipment and coordinated operations.
  • C. manufacturing plant
    A manufacturing plant is a large-scale industrial facility where raw materials are transformed through organized processes, machinery, and labor into finished goods or components.
  • D. radioactive waste processing facility
    A radioactive waste processing facility is a specialized industrial installation that receives, treats, conditions, and packages radioactive materials to reduce their hazard and prepare them for safe transport, storage, or disposal in compliance with strict regulatory and environmental standards.
  • E. battery manufacturing plant
    A battery manufacturing plant is an industrial facility where raw materials are processed and assembled into finished batteries through a series of automated and manual production, testing, and quality control operations.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca8297699481909b75a405f01e03af completed March 30, 2026, 2:03 p.m.
Created at: March 30, 2026, 5:13 p.m.