Triple

T7970886
Position Surface form Disambiguated ID Type / Status
Subject Lightning Lane E185319 entity
Predicate instanceOf P0 FINISHED
Object theme park line-skipping service C11208 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: theme park line-skipping service
Context triple: [Lightning Lane, instanceOf, theme park line-skipping service]
  • A. theme park service
    A theme park service is an offering that enhances visitors’ experiences through entertainment, amenities, operations, and guest support within a themed recreational environment.
  • B. theme park virtual queue system chosen
    A theme park virtual queue system is a digital service that allows guests to reserve places in line for attractions via mobile devices or kiosks, reducing physical wait times and managing crowd flow in real time.
  • C. theme park entrance
    The theme park entrance is the primary access point where guests transition from the outside world into the park, typically featuring ticketing, security, and iconic visual elements that establish the park’s identity and atmosphere.
  • D. theme park setting
    A theme park setting is a large, immersive entertainment environment organized around specific themes, featuring rides, attractions, performances, and themed areas designed to create a cohesive, fantastical experience for visitors.
  • E. theme park show
    A theme park show is a live or pre-recorded entertainment performance within a theme park, designed to engage guests through storytelling, music, special effects, and character appearances that enhance the park’s overall themed experience.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca8297699481909b75a405f01e03af completed March 30, 2026, 2:03 p.m.
Created at: March 30, 2026, 5:13 p.m.