Triple
T7956972
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | National Highway 35 |
E184763
|
entity |
| Predicate | abbreviation |
P43
|
FINISHED |
| Object |
NH 35
NH 35 is a major Indian National Highway that connects key cities and regions across the state of Uttar Pradesh.
|
E702399
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: NH 35 | Statement: [National Highway 35, abbreviation, NH 35]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: NH 35 Context triple: [National Highway 35, abbreviation, NH 35]
-
A.
NH 37
NH 37 is a former designation for a major Indian national highway that runs across the state of Assam, connecting key cities and towns in the region.
-
B.
NH 44
NH 44 is one of India’s longest and most important national highways, running north–south across multiple states and connecting major cities from Srinagar to Kanyakumari.
-
C.
NH 75
NH 75 is a former designation of a major Indian national highway that was renumbered and incorporated into the extensive National Highway 44 route.
-
D.
NH 544
NH 544 is a major Indian National Highway in southern India that connects key cities in Tamil Nadu and Kerala, serving as an important route for regional trade and travel.
-
E.
NH 65
NH 65 is a major National Highway in India that runs east–west, connecting the states of Maharashtra, Karnataka, Telangana, and Andhra Pradesh.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: NH 35 Triple: [National Highway 35, abbreviation, NH 35]
Generated description
NH 35 is a major Indian National Highway that connects key cities and regions across the state of Uttar Pradesh.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: NH 35 Target entity description: NH 35 is a major Indian National Highway that connects key cities and regions across the state of Uttar Pradesh.
-
A.
NH 37
NH 37 is a former designation for a major Indian national highway that runs across the state of Assam, connecting key cities and towns in the region.
-
B.
NH 44
NH 44 is one of India’s longest and most important national highways, running north–south across multiple states and connecting major cities from Srinagar to Kanyakumari.
-
C.
NH 75
NH 75 is a former designation of a major Indian national highway that was renumbered and incorporated into the extensive National Highway 44 route.
-
D.
NH 544
NH 544 is a major Indian National Highway in southern India that connects key cities in Tamil Nadu and Kerala, serving as an important route for regional trade and travel.
-
E.
NH 65
NH 65 is a major National Highway in India that runs east–west, connecting the states of Maharashtra, Karnataka, Telangana, and Andhra Pradesh.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca8292cba881908a64427b938dac47 |
completed | March 30, 2026, 2:02 p.m. |
| NER | Named-entity recognition | batch_69cb3b7d36c081908cc8760a0dbf6001 |
completed | March 31, 2026, 3:11 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69cbe072ef4c8190a8e078c5280913db |
completed | March 31, 2026, 2:55 p.m. |
| NEDg | Description generation | batch_69cbe43a45b48190b2bdc793f2bd3264 |
completed | March 31, 2026, 3:11 p.m. |
| NED2 | Entity disambiguation (via description) | batch_69cc11c673d88190b2796fb6efac6b09 |
completed | March 31, 2026, 6:26 p.m. |
Created at: March 30, 2026, 5:11 p.m.