Triple
T7947088
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | 双一流 |
E184523
|
entity |
| Predicate | 建设周期 |
P3543
|
FINISHED |
| Object | 以若干轮建设期滚动支持 |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 以若干轮建设期滚动支持 | Statement: [双一流, 建设周期, 以若干轮建设期滚动支持]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: 建设周期 Context triple: [双一流, 建设周期, 以若干轮建设期滚动支持]
-
A.
constructionTime
chosen
Indicates the duration or specific point in time required to construct or build an entity.
-
B.
hasBuildingPeriod
Indicates that a building or structure is associated with a specific time period during which it was constructed or significantly developed.
-
C.
operatingCycle
Indicates the duration or process through which an entity completes a full sequence of its operations from start to finish.
-
D.
constructionPhase
Indicates the specific stage or period an entity is in within an overall construction or building process.
-
E.
timePeriodOfProduction
Indicates the span of time during which something was produced or created.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca8291c2008190b1b8832c87814bcf |
completed | March 30, 2026, 2:02 p.m. |
| NER | Named-entity recognition | batch_69cb3b2abdbc819085ae53826d36af3b |
completed | March 31, 2026, 3:10 a.m. |
| PD | Predicate disambiguation | batch_69cae93526d081909303265bf60419fd |
completed | March 30, 2026, 9:20 p.m. |
Created at: March 30, 2026, 5:09 p.m.