Triple
T7940554
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | G. Scott Hubbard |
E184377
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | NASA official |
C16981
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: NASA official Context triple: [G. Scott Hubbard, instanceOf, NASA official]
-
A.
NASA office
A NASA office is a workspace within the NASA organization where administrative, scientific, engineering, and mission-planning activities are coordinated and managed.
-
B.
NASA position
chosen
A NASA position is a specific job role within the National Aeronautics and Space Administration responsible for contributing expertise to the agency’s missions in space exploration, scientific research, aeronautics, or technology development.
-
C.
NASA headquarters office
The NASA headquarters office is the central administrative and executive facility where national space policy, mission planning, and agency-wide coordination are directed and managed.
-
D.
NASA directorate
A NASA directorate is a major organizational division within NASA responsible for planning, managing, and executing a specific domain of the agency’s missions, programs, and research activities.
-
E.
NASA network
A NASA network is an interconnected system of communication, data, and computing resources that links NASA’s spacecraft, ground stations, research centers, and partner organizations to support space missions and scientific operations.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca8291c2008190b1b8832c87814bcf |
completed | March 30, 2026, 2:02 p.m. |
Created at: March 30, 2026, 5:08 p.m.