Triple

T7937305
Position Surface form Disambiguated ID Type / Status
Subject Web Tools Platform E184316 entity
Predicate instanceOf P0 FINISHED
Object software development toolset C11639 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: software development toolset
Context triple: [Web Tools Platform, instanceOf, software development toolset]
  • A. software development system
    A software development system is an integrated environment of tools, processes, and infrastructure that supports the planning, creation, testing, deployment, and maintenance of software applications.
  • B. collection of programming tools chosen
    A collection of programming tools is an organized set of software utilities, libraries, and environments designed to assist developers in writing, testing, debugging, and maintaining code efficiently.
  • C. developer tool
    A developer tool is a software application or utility designed to help programmers create, test, debug, and maintain code more efficiently.
  • D. software development methodology
    A software development methodology is a structured framework of principles, practices, and processes that guides how software is planned, designed, built, tested, and delivered.
  • E. software development program
    A software development program is an organized set of tools, processes, and educational or operational components designed to plan, create, test, and maintain software applications efficiently and reliably.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca8290c21c8190906a5ca6fe2b03c4 completed March 30, 2026, 2:02 p.m.
Created at: March 30, 2026, 5:08 p.m.