Triple
T7937010
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | BPMN |
E184310
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | graphical notation standard |
C11235
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: graphical notation standard Context triple: [BPMN, instanceOf, graphical notation standard]
-
A.
formal grammar notation
A formal grammar notation is a precise symbolic system for defining the syntactic structure of languages by specifying how valid strings can be generated from a set of production rules.
-
B.
knot notation
Knot notation is a symbolic system used to represent and distinguish different mathematical knots by encoding their crossings, structure, and equivalence classes.
-
C.
visual modeling language
chosen
A visual modeling language is a formal system that uses graphical notations (such as diagrams, symbols, and connectors) to represent, design, and communicate the structure and behavior of complex systems.
-
D.
knot notation system
A knot notation system is a structured method for symbolically representing and classifying knots using standardized codes or diagrams that capture their topological properties.
-
E.
graphical programming environment
A graphical programming environment is a software system that allows users to create, modify, and connect program elements visually (often via drag-and-drop blocks or diagrams) instead of writing traditional text-based code.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca8290c21c8190906a5ca6fe2b03c4 |
completed | March 30, 2026, 2:02 p.m. |
Created at: March 30, 2026, 5:08 p.m.