Triple

T7931558
Position Surface form Disambiguated ID Type / Status
Subject Wing E184199 entity
Predicate instanceOf P0 FINISHED
Object user interface project C23206 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: user interface project
Context triple: [Wing, instanceOf, user interface project]
  • A. graphical user interface framework
    A graphical user interface framework is a collection of tools, libraries, and components that simplifies building, organizing, and managing interactive visual elements of software applications.
  • B. user interface design language
    A user interface design language is a standardized set of visual, interaction, and behavioral guidelines that define how digital interfaces should look and function to ensure consistency and usability across products.
  • C. UI framework
    A UI framework is a collection of tools, libraries, and components that provide a structured way to build, style, and manage user interfaces for applications.
  • D. cross-platform UI framework
    A cross-platform UI framework is a software toolkit that enables developers to build user interfaces once and deploy them across multiple operating systems and devices with minimal platform-specific changes.
  • E. user experience design tool
    A user experience design tool is a software application that enables designers to plan, prototype, test, and refine digital product interfaces and interactions to optimize usability and user satisfaction.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca8290c21c8190906a5ca6fe2b03c4 completed March 30, 2026, 2:02 p.m.
Created at: March 30, 2026, 5:07 p.m.