Triple
T7927875
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Holmes Approved Homes program |
E184112
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | residential construction certification program |
C5961
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: residential construction certification program Context triple: [Holmes Approved Homes program, instanceOf, residential construction certification program]
-
A.
green building certification system
chosen
A green building certification system is a standardized framework that evaluates and rates buildings based on their environmental performance, resource efficiency, and sustainability practices throughout design, construction, and operation.
-
B.
professional certification
A professional certification is an official credential awarded by a recognized body that verifies an individual's knowledge, skills, and competence in a specific professional field or role.
-
C.
residential property
A residential property is a building or land designated and used primarily for people to live in, such as houses, apartments, or condominiums.
-
D.
architectural qualification
Architectural qualification is the process of evaluating and certifying that a building’s design, materials, and systems meet specified performance, safety, regulatory, and functional requirements.
-
E.
building technology evaluation program
A building technology evaluation program is a structured process or system for assessing the performance, cost-effectiveness, sustainability, and regulatory compliance of building-related technologies in real or simulated conditions.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca828fe7bc819090f52c88dcd72183 |
completed | March 30, 2026, 2:02 p.m. |
Created at: March 30, 2026, 5:07 p.m.