Triple
T7920886
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | ISO/IEC JTC 1/SC 22 |
E183940
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | IEC subcommittee |
C18859
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: IEC subcommittee Context triple: [ISO/IEC JTC 1/SC 22, instanceOf, IEC subcommittee]
-
A.
ISO/IEC subcommittee
chosen
An ISO/IEC subcommittee is a specialized working group within the joint International Organization for Standardization and International Electrotechnical Commission structure that develops, maintains, and oversees standards in a specific technical or thematic area.
-
B.
United States national committee of the IEC
The United States National Committee of the IEC is the U.S. body responsible for coordinating national participation in the International Electrotechnical Commission’s standardization activities and representing U.S. interests in global electrotechnical standards development.
-
C.
IEC standard
An IEC standard is a globally recognized technical specification developed by the International Electrotechnical Commission to ensure safety, interoperability, and performance of electrical and electronic systems and devices.
-
D.
technical subcommittee
A technical subcommittee is a specialized group within a larger organization tasked with analyzing, developing, and recommending solutions on specific technical issues or standards.
-
E.
IEC Conformity Assessment System
The IEC Conformity Assessment System is a structured framework of international schemes and procedures used to evaluate and certify that electrical, electronic, and related technologies comply with IEC standards.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca828efbe48190bd48482650182e79 |
completed | March 30, 2026, 2:02 p.m. |
Created at: March 30, 2026, 5:06 p.m.