Triple
T7920136
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Parachute Jump |
E183924
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | amusement ride tower |
C8768
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: amusement ride tower Context triple: [Parachute Jump, instanceOf, amusement ride tower]
-
A.
amusement park attraction
chosen
An amusement park attraction is a designed entertainment feature or ride that provides guests with thrilling, enjoyable, or immersive experiences within a themed recreational setting.
-
B.
Ferris wheel
A Ferris wheel is a large, rotating upright wheel with passenger cabins attached to its rim, providing riders with elevated, circular views of the surrounding area.
-
C.
drop tower ride
A drop tower ride is an amusement park attraction where riders are lifted to a great height before being rapidly released to experience a high-speed free fall and sudden deceleration.
-
D.
roller coaster
A roller coaster is an amusement ride consisting of a track with steep drops, sharp turns, and inversions that carries passengers in open cars for a thrilling, high-speed experience.
-
E.
carousel-style ride
A carousel-style ride is an amusement attraction featuring a rotating circular platform with seats, often shaped like animals or vehicles, that move up and down as the ride spins.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca828efbe48190bd48482650182e79 |
completed | March 30, 2026, 2:02 p.m. |
Created at: March 30, 2026, 5:06 p.m.