Triple

T7913546
Position Surface form Disambiguated ID Type / Status
Subject Forsyth County, North Carolina E183758 entity
Predicate hasMajorHighway P385 FINISHED
Object Interstate 285 E490626 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Interstate 285 | Statement: [Forsyth County, North Carolina, hasMajorHighway, Interstate 285]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Interstate 285
Context triple: [Forsyth County, North Carolina, hasMajorHighway, Interstate 285]
  • A. Interstate 285
    Interstate 285 is the beltway encircling Atlanta, Georgia, serving as a major bypass and connector for multiple interstate highways around the metropolitan area.
  • B. Interstate 285 chosen
    Interstate 285 is a short auxiliary Interstate highway in North Carolina that serves as a connector route near Winston-Salem.
  • C. Interstate 275
    Interstate 275 is a bypass freeway in southeastern Michigan that forms part of the outer beltway around the Detroit metropolitan area.
  • D. Interstate 275
    Interstate 275 is a major auxiliary Interstate Highway that serves as a bypass and urban loop around the Tampa Bay area in Florida.
  • E. Interstate 275
    Interstate 275 is a short auxiliary Interstate Highway in Knoxville, Tennessee, serving as a connector route through the city between major regional interstates.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca828dec0c81908b8f55a4dbbb53ff completed March 30, 2026, 2:02 p.m.
NER Named-entity recognition batch_69cb3a748f4c8190bcd868de2fcf0b3a completed March 31, 2026, 3:07 a.m.
NED1 Entity disambiguation (via context triple) batch_69d55585857c8190a4e4626a92197232 completed April 7, 2026, 7:05 p.m.
Created at: March 30, 2026, 5:04 p.m.