Triple

T7897209
Position Surface form Disambiguated ID Type / Status
Subject Plastic SCM E183367 entity
Predicate instanceOf P0 FINISHED
Object software configuration management tool C15486 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: software configuration management tool
Context triple: [Plastic SCM, instanceOf, software configuration management tool]
  • A. configuration management framework
    A configuration management framework is a system that automates the definition, deployment, and ongoing enforcement of desired configurations across infrastructure and applications in a consistent, repeatable way.
  • B. system administration tool
    A system administration tool is software that helps IT professionals manage, configure, monitor, and automate tasks across computer systems and networks.
  • C. software package manager
    A software package manager is a tool that automates the discovery, installation, updating, configuration, and removal of software packages and their dependencies in a consistent and reliable way.
  • D. software build and distribution system
    A software build and distribution system automates compiling source code, packaging artifacts, and delivering them reliably to target environments or end users.
  • E. developer tool chosen
    A developer tool is a software application or utility designed to help programmers create, test, debug, and maintain code more efficiently.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca828c474c8190a254d6499871eaff completed March 30, 2026, 2:02 p.m.
Created at: March 30, 2026, 5:01 p.m.