Triple

T7897208
Position Surface form Disambiguated ID Type / Status
Subject Plastic SCM E183367 entity
Predicate instanceOf P0 FINISHED
Object version control software C227 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: version control software
Context triple: [Plastic SCM, instanceOf, version control software]
  • A. software development system
    A software development system is an integrated environment of tools, processes, and infrastructure that supports the planning, creation, testing, deployment, and maintenance of software applications.
  • B. software package
    A software package is a bundled collection of programs, libraries, configuration files, and metadata distributed together to provide specific functionality that can be easily installed, updated, and managed.
  • C. software chosen
    Software is a collection of programs, data, and instructions that tell a computer or digital device how to perform specific tasks or functions.
  • D. SCM system
    An SCM system (Supply Chain Management system) is a software platform that plans, executes, and monitors the end-to-end flow of goods, information, and finances across the supply chain to optimize efficiency, cost, and service levels.
  • E. bug tracking system
    A bug tracking system is a software tool that records, organizes, and manages reported defects or issues throughout a product’s development and maintenance lifecycle.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca828c474c8190a254d6499871eaff completed March 30, 2026, 2:02 p.m.
Created at: March 30, 2026, 5:01 p.m.