Triple

T788731
Position Surface form Disambiguated ID Type / Status
Subject B969 road E16862 entity
Predicate instanceOf P0 FINISHED
Object B road C3254 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: B road
Context triple: [B969 road, instanceOf, B road]
  • A. road chosen
    A road is a prepared surface or pathway designed for the movement of vehicles, pedestrians, or animals between different locations.
  • B. backcountry road
    A backcountry road is a narrow, often unpaved or lightly maintained rural roadway that winds through remote or sparsely populated areas, typically offering scenic views and limited services.
  • C. north–south highway
    A north–south highway is a major roadway that primarily runs in a longitudinal direction, connecting regions or cities along a north-to-south axis.
  • D. road pass
    A road pass is a designated route or permit that allows vehicles or travelers to cross through a specific roadway segment, often over or through difficult terrain or restricted areas.
  • E. road segment
    A road segment is a continuous portion of a roadway between two defined endpoints, such as intersections or junctions, characterized by uniform attributes like direction, number of lanes, and speed limit.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a4936cb7448190914f5fe4b8d81607 completed March 1, 2026, 7:28 p.m.
Created at: March 1, 2026, 7:38 p.m.