Triple

T7882870
Position Surface form Disambiguated ID Type / Status
Subject River des Peres (channelized section) E183024 entity
Predicate instanceOf P0 FINISHED
Object engineered watercourse C6500 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: engineered watercourse
Context triple: [River des Peres (channelized section), instanceOf, engineered watercourse]
  • A. urban watercourse
    An urban watercourse is a natural or engineered channel of flowing water that runs through a city or town, shaped and managed by surrounding urban infrastructure and land use.
  • B. drainage channel chosen
    A drainage channel is a constructed or natural linear feature designed to collect and convey excess surface or subsurface water away from an area to prevent flooding, erosion, or waterlogging.
  • C. restored waterway
    A restored waterway is a previously degraded or altered river, stream, or canal that has been rehabilitated to improve its ecological function, water quality, and surrounding habitat while often enhancing recreational and aesthetic values.
  • D. canal aqueduct
    A canal aqueduct is a bridge-like structure that carries a navigable waterway over obstacles such as rivers, valleys, roads, or other canals.
  • E. navigable waterway
    A navigable waterway is a natural or artificial body of water, such as a river, canal, or channel, that is deep and wide enough for vessels to travel safely for transportation or commerce.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca828af6e48190a06ee7010d8f0e64 completed March 30, 2026, 2:02 p.m.
Created at: March 30, 2026, 4:58 p.m.