Triple

T7872852
Position Surface form Disambiguated ID Type / Status
Subject Hyderabad-Karnataka E182779 entity
Predicate includesDistrict P22582 FINISHED
Object Raichur E37145 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Raichur | Statement: [Hyderabad-Karnataka, includesDistrict, Raichur]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Raichur
Context triple: [Hyderabad-Karnataka, includesDistrict, Raichur]
  • A. Raichur chosen
    Raichur is a historic city in the Indian state of Karnataka, known for its ancient forts, archaeological significance, and strategic location between major river systems.
  • B. Yadgir
    Yadgir is a district in the Indian state of Karnataka, known for its agricultural economy and historical forts and temples.
  • C. Nagole
    Nagole is a residential and commercial neighborhood in Hyderabad, India, served as a key terminus and transit hub on the Hyderabad Metro network.
  • D. Baramati
    Baramati is a town in the Pune district of Maharashtra, India, known as an agricultural and industrial hub with historical and political significance.
  • E. Karur
    Karur is a town in the Indian state of Tamil Nadu known as an important textile, bus body building, and industrial center on the banks of the Amaravathi River.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca828a17248190b46defe758bc5ad3 completed March 30, 2026, 2:02 p.m.
NER Named-entity recognition batch_69cb39a6d93881908d68386e49bea1e3 completed March 31, 2026, 3:04 a.m.
NED1 Entity disambiguation (via context triple) batch_69cd9423b4608190acbe4a3141890a05 completed April 1, 2026, 9:54 p.m.
Created at: March 30, 2026, 4:56 p.m.