Triple
T7869903
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Cisco NX-OS |
E182711
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Cisco software product |
C23055
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Cisco software product Context triple: [Cisco NX-OS, instanceOf, Cisco software product]
-
A.
Cisco proprietary protocol
A Cisco proprietary protocol is a network communication method or standard developed and owned by Cisco Systems, designed to provide specialized features and optimizations that typically operate only on Cisco devices or in Cisco-centric environments.
-
B.
Cisco initiative
A Cisco initiative is a strategic program or project undertaken by Cisco to drive innovation, improve technologies or services, and advance specific business, social, or industry objectives.
-
C.
networking hardware company
A networking hardware company designs, manufactures, and sells physical devices and infrastructure that enable data communication and connectivity across computer networks.
-
D.
networking hardware vendor
A networking hardware vendor is a company that designs, manufactures, and sells physical devices such as routers, switches, and firewalls that enable and manage data communication across computer networks.
-
E.
Microsoft product
A Microsoft product is any software, service, or hardware solution developed, marketed, or maintained by Microsoft to address user, business, or developer needs.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca82894d9081908a832bfce71a4714 |
completed | March 30, 2026, 2:02 p.m. |
Created at: March 30, 2026, 4:55 p.m.