Triple
T7864529
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Tarlac-class landing platform dock |
E182582
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | landing platform dock class |
C23049
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: landing platform dock class Context triple: [Tarlac-class landing platform dock, instanceOf, landing platform dock class]
-
A.
dry dock
A dry dock is a narrow basin or vessel that can be flooded to allow a ship to be floated in, then drained to expose the hull for construction, maintenance, or repair.
-
B.
boatyard
A boatyard is a waterside facility where boats and ships are built, repaired, maintained, and often stored on land.
-
C.
river ferry dock
A river ferry dock is a designated waterfront structure where ferries safely load, unload, and temporarily moor while transporting passengers, vehicles, or goods across a river.
-
D.
seaplane base
A seaplane base is a designated water aerodrome, often with minimal shore facilities, where seaplanes and amphibious aircraft can take off, land, dock, and receive basic services.
-
E.
public boating facility
A public boating facility is a designated area with infrastructure and services that provide public access to waterways for launching, docking, and maintaining recreational or commercial boats.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca82894d9081908a832bfce71a4714 |
completed | March 30, 2026, 2:02 p.m. |
Created at: March 30, 2026, 4:54 p.m.