Triple

T7852412
Position Surface form Disambiguated ID Type / Status
Subject Watson Lake E182086 entity
Predicate createdBy P806 FINISHED
Object Watson Dam E720030 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Watson Dam | Statement: [Watson Lake, createdBy, Watson Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Watson Dam
Context triple: [Watson Lake, createdBy, Watson Dam]
  • A. Watson Dam chosen
    Watson Dam is a man-made structure that impounds Watson Lake, helping to regulate water flow and create the reservoir in its surrounding area.
  • B. Waddell Dam
    Waddell Dam is a major dam in Arizona that impounds the Agua Fria River to form Lake Pleasant, a key water storage and recreation reservoir for the Phoenix metropolitan area.
  • C. Belver Dam
    Belver Dam is a hydroelectric dam on the Tagus River in Portugal, used primarily for power generation and river flow regulation.
  • D. Merwin Dam
    Merwin Dam is a hydroelectric dam on Washington State’s Lewis River that forms Lake Merwin and generates power for the region.
  • E. Howden Dam
    Howden Dam is a large masonry dam in Derbyshire, England, forming part of the Upper Derwent Valley reservoir system and known for its impressive architecture and role in regional water supply.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca82869ee08190b8f9040dbc2c0467 completed March 30, 2026, 2:02 p.m.
NER Named-entity recognition batch_69cb18ec48548190960bd564a60effa8 completed March 31, 2026, 12:44 a.m.
NED1 Entity disambiguation (via context triple) batch_69cd66ecea6c819097a74513c5d84193 completed April 1, 2026, 6:41 p.m.
Created at: March 30, 2026, 4:51 p.m.