Triple

T7841498
Position Surface form Disambiguated ID Type / Status
Subject Gotha G-series bombers E181814 entity
Predicate instanceOf P0 FINISHED
Object bomber aircraft family C16791 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: bomber aircraft family
Context triple: [Gotha G-series bombers, instanceOf, bomber aircraft family]
  • A. strategic bomber
    A strategic bomber is a long-range military aircraft designed to deliver large payloads of bombs or missiles against distant, high-value strategic targets such as infrastructure, industry, and command centers.
  • B. land‑based bomber
    A land-based bomber is a military aircraft designed to take off from ground airfields to deliver large payloads of bombs or missiles against strategic or tactical targets over long distances.
  • C. tactical bomber
    A tactical bomber is a military aircraft designed to deliver precision strikes against battlefield targets and enemy infrastructure in direct support of ground or naval operations.
  • D. World War I bomber chosen
    A World War I bomber is a military aircraft designed and used during the First World War to carry and drop bombs on enemy targets, including strategic infrastructure, troop concentrations, and supply lines.
  • E. bomber wing
    A bomber wing is a large military aviation unit composed of multiple bomber squadrons, support elements, and command staff organized to plan, coordinate, and execute bombing operations.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca8285d6488190a95d4c02d7354b53 completed March 30, 2026, 2:02 p.m.
Created at: March 30, 2026, 4:47 p.m.