Triple

T7839253
Position Surface form Disambiguated ID Type / Status
Subject Sir Peter Parker E181762 entity
Predicate instanceOf P0 FINISHED
Object railway executive C8930 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: railway executive
Context triple: [Sir Peter Parker, instanceOf, railway executive]
  • A. railway infrastructure manager
    A railway infrastructure manager is an entity responsible for the planning, construction, maintenance, operation, and safe management of railway tracks, signaling systems, and related fixed installations.
  • B. railway worker
    A railway worker is an individual responsible for the operation, maintenance, safety, and support services of trains and railway infrastructure.
  • C. transportation executive chosen
    A transportation executive is a senior leader responsible for planning, directing, and optimizing an organization’s transportation and logistics operations to ensure efficient, cost-effective, and compliant movement of goods or people.
  • D. public railway
    A public railway is a government- or publicly-owned rail transport system that provides scheduled passenger and/or freight services accessible to the general population, typically operating on standardized tracks and infrastructure.
  • E. railway holding company
    A railway holding company is a parent corporation that owns and controls one or more railway operating or infrastructure companies, managing their strategic direction and financial interests without necessarily running day-to-day train operations itself.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca8284a25c8190a1a20afad30da792 completed March 30, 2026, 2:02 p.m.
Created at: March 30, 2026, 4:47 p.m.