Triple

T783824
Position Surface form Disambiguated ID Type / Status
Subject Lansing, Michigan E16556 entity
Predicate majorHighway P385 FINISHED
Object Interstate 69 E284108 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Interstate 69 | Statement: [Lansing, Michigan, majorHighway, Interstate 69]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Interstate 69
Context triple: [Lansing, Michigan, majorHighway, Interstate 69]
  • A. Interstate 69 chosen
    Interstate 69 is a major north–south U.S. highway that runs through multiple states in the Midwest and South, serving as an important regional and interstate transportation route.
  • B. Interstate 49
    Interstate 49 is a major north–south U.S. Interstate Highway running through multiple states in the central United States, including Missouri.
  • C. Interstate 65
    Interstate 65 is a major north–south U.S. highway running through the central United States, connecting the Gulf Coast to the Midwest and serving key cities such as Mobile, Birmingham, Nashville, and Indianapolis.
  • D. Interstate 55
    Interstate 55 is a major north–south U.S. highway running from Louisiana to Illinois, connecting cities such as New Orleans, Memphis, and Chicago.
  • E. Interstate 73
    Interstate 73 is a north–south U.S. Interstate Highway that runs through several states in the eastern United States, including North Carolina.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a4936ad1fc81908f190208059ccf78 completed March 1, 2026, 7:28 p.m.
NER Named-entity recognition batch_69a4a769dc6481908f12e872f997acf3 completed March 1, 2026, 8:54 p.m.
NED1 Entity disambiguation (via context triple) batch_69b44eb4706c8190870d99abc140973d completed March 13, 2026, 5:51 p.m.
Created at: March 1, 2026, 7:37 p.m.