Triple

T7802450
Position Surface form Disambiguated ID Type / Status
Subject Muskrat Falls Generating Station E180461 entity
Predicate gridConnection P845 FINISHED
Object North American power grid E522796 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: North American power grid | Statement: [Muskrat Falls Generating Station, gridConnection, North American power grid]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: North American power grid
Context triple: [Muskrat Falls Generating Station, gridConnection, North American power grid]
  • A. North American power transmission grid chosen
    The North American power transmission grid is the vast, interconnected high-voltage network that delivers electricity across the United States, Canada, and parts of Mexico through several major synchronized interconnections.
  • B. Eastern Interconnection
    The Eastern Interconnection is one of North America's major synchronized AC power grids, spanning much of the eastern and central United States and parts of Canada.
  • C. Ontario electricity grid
    The Ontario electricity grid is the province-wide interconnected network of power generation, transmission, and distribution infrastructure that delivers electricity to homes, businesses, and industries across Ontario, Canada.
  • D. Western Interconnection
    The Western Interconnection is a major synchronized electric power grid that spans much of western North America, linking utilities and power plants across multiple U.S. states, Canadian provinces, and parts of Mexico.
  • E. Southeastern United States electric grid
    The Southeastern United States electric grid is the interconnected regional power network that delivers electricity across the southeastern states, integrating generation sources like nuclear, coal, natural gas, and renewables to serve homes, businesses, and industry.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca827e50cc8190a92a733577184938 completed March 30, 2026, 2:02 p.m.
NER Named-entity recognition batch_69cae988bc2081909870bae1c2e9c238 completed March 30, 2026, 9:22 p.m.
NED1 Entity disambiguation (via context triple) batch_69cb14371e2081908d0a798d3b785c3c completed March 31, 2026, 12:24 a.m.
Created at: March 30, 2026, 4:33 p.m.