Triple

T7796264
Position Surface form Disambiguated ID Type / Status
Subject Metrocable Medellín E180305 entity
Predicate instanceOf P0 FINISHED
Object gondola lift network C1080 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: gondola lift network
Context triple: [Metrocable Medellín, instanceOf, gondola lift network]
  • A. cable car system chosen
    A cable car system is a transportation network in which vehicles are pulled by continuously moving cables, typically used to move people or goods along steep or inaccessible routes such as mountainsides or urban hills.
  • B. cable car station
    A cable car station is a designated facility where passengers board, disembark, and transfer between cable-propelled vehicles, typically featuring platforms, ticketing areas, and equipment for operating and maintaining the cable system.
  • C. ski pass
    A ski pass is an authorization token, often in the form of a card or digital credential, that grants its holder access to ski lifts and designated ski areas for a specified time and set of conditions.
  • D. people mover system
    A people mover system is an automated transportation network designed to efficiently move passengers over short to medium distances within confined areas such as airports, campuses, or urban centers.
  • E. mountain station
    A mountain station is a facility or settlement located at a high elevation in mountainous terrain, typically serving as a base for transportation, research, tourism, or outdoor activities.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca827d22208190b4dc5aa680edcf5d completed March 30, 2026, 2:02 p.m.
Created at: March 30, 2026, 4:32 p.m.