Triple
T7796262
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Metrocable Medellín |
E180305
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | urban cable car system |
C1080
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: urban cable car system Context triple: [Metrocable Medellín, instanceOf, urban cable car system]
-
A.
cable car system
chosen
A cable car system is a transportation network in which vehicles are pulled by continuously moving cables, typically used to move people or goods along steep or inaccessible routes such as mountainsides or urban hills.
-
B.
streetcar system
A streetcar system is an urban public transit network that operates rail vehicles on fixed tracks, typically embedded in city streets, to transport passengers along defined routes.
-
C.
public transit system
A public transit system is an organized network of shared transportation services—such as buses, trains, subways, and trams—designed to move large numbers of people efficiently within and between urban and regional areas.
-
D.
cable car station
A cable car station is a designated facility where passengers board, disembark, and transfer between cable-propelled vehicles, typically featuring platforms, ticketing areas, and equipment for operating and maintaining the cable system.
-
E.
urban rail loop line
An urban rail loop line is a circular or near-circular transit route within a city that connects multiple districts and intersecting lines, allowing continuous, bidirectional travel without a terminal endpoint.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca827d22208190b4dc5aa680edcf5d |
completed | March 30, 2026, 2:02 p.m. |
Created at: March 30, 2026, 4:32 p.m.