Triple

T7788394
Position Surface form Disambiguated ID Type / Status
Subject Amaravati E187306 entity
Predicate proposedInfrastructure P79013 FINISHED
Object metro rail connectivity to Vijayawada LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: metro rail connectivity to Vijayawada | Statement: [Amaravati, proposedInfrastructure, metro rail connectivity to Vijayawada]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: proposedInfrastructure
Context triple: [Amaravati, proposedInfrastructure, metro rail connectivity to Vijayawada]
  • A. permanentInfrastructure
    Indicates that the relationship involves infrastructure that is intended to be long-lasting, fixed in place, and not temporary or easily removable.
  • B. infrastructureImpact
    Indicates the effect that an action, event, or entity has on the condition, performance, or availability of infrastructure systems.
  • C. usedTransportationInfrastructure
    Indicates that an entity made use of some form of transportation infrastructure (such as roads, railways, or ports) to enable movement or transit.
  • D. operatorOfTransportInfrastructure
    Indicates that an entity operates, manages, or runs a specific piece of transport infrastructure.
  • E. isPartOfInfrastructure
    Indicates that something belongs to, is included within, or functions as a component of a larger infrastructure system.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca82af2d2c8190963861f5e0b8bf21 completed March 30, 2026, 2:03 p.m.
NER Named-entity recognition batch_69cae7e8a0d08190b6d4ca560681eb35 completed March 30, 2026, 9:15 p.m.
PD Predicate disambiguation batch_69caa488532c819093ac40bba0b3c7ef completed March 30, 2026, 4:27 p.m.
PDg Predicate description generation batch_69cae7e47c5c8190bca90d45b3cdc25e completed March 30, 2026, 9:15 p.m.
Created at: March 30, 2026, 4:24 p.m.