Triple
T7778870
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Trident–Quadrant strategic decisions |
E221464
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | World War II Allied strategy |
C16897
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: World War II Allied strategy Context triple: [Trident–Quadrant strategic decisions, instanceOf, World War II Allied strategy]
-
A.
World War II campaign
A World War II campaign is a coordinated series of military operations conducted over a specific period and geographic area, aimed at achieving strategic objectives within the broader context of the war.
-
B.
World War II military plan
chosen
A World War II military plan is a strategically designed, time-bound set of coordinated operations and resource allocations intended to achieve specific political and military objectives within the context of the global conflict.
-
C.
World War II offensive
A World War II offensive is a coordinated, large-scale military campaign conducted by one or more nations to seize strategic objectives, weaken enemy forces, or shift the balance of the war in a specific theater or front.
-
D.
World War II project
A World War II project is a structured investigation or creative work that explores specific aspects of the Second World War—such as events, people, technology, or impacts—using historical sources to analyze and present findings.
-
E.
World War II front
A World War II front is a large-scale, geographically defined theater of military operations where opposing forces engaged in sustained combat and strategic maneuvers during the Second World War.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca83ebbef881909ac47f789145fef7 |
completed | March 30, 2026, 2:08 p.m. |
Created at: March 30, 2026, 4:18 p.m.