Triple
T7777861
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Warning Decision Support System – Integrated Information |
E221439
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | severe weather warning system |
C3917
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: severe weather warning system Context triple: [Warning Decision Support System – Integrated Information, instanceOf, severe weather warning system]
-
A.
public warning system
chosen
A public warning system is an organized infrastructure of technologies, protocols, and communication channels designed to rapidly alert and inform the public about imminent or ongoing emergencies and hazards.
-
B.
numerical weather prediction model
A numerical weather prediction model is a computational system that uses mathematical equations and atmospheric data to simulate and forecast future weather conditions.
-
C.
meteorological infrastructure
Meteorological infrastructure comprises the interconnected network of instruments, stations, communication systems, and data-processing facilities used to observe, measure, and analyze atmospheric conditions for weather forecasting and climate monitoring.
-
D.
global data-processing and forecasting system
A global data-processing and forecasting system is an integrated platform that ingests, cleans, analyzes, and models large-scale, heterogeneous data from worldwide sources to generate timely predictions and insights for decision-making.
-
E.
missile warning system
A missile warning system is a defense mechanism that detects, tracks, and alerts relevant entities to incoming missile threats to enable timely protective or countermeasure responses.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca83ebbef881909ac47f789145fef7 |
completed | March 30, 2026, 2:08 p.m. |
Created at: March 30, 2026, 4:16 p.m.