Triple

T7777860
Position Surface form Disambiguated ID Type / Status
Subject Warning Decision Support System – Integrated Information E221439 entity
Predicate instanceOf P0 FINISHED
Object weather analysis software C11919 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: weather analysis software
Context triple: [Warning Decision Support System – Integrated Information, instanceOf, weather analysis software]
  • A. climate forecast product
    A climate forecast product is an information package that provides scientifically derived predictions of future climate conditions (such as temperature, precipitation, or extreme events) over specified regions and time horizons to support planning and decision-making.
  • B. meteorological infrastructure
    Meteorological infrastructure comprises the interconnected network of instruments, stations, communication systems, and data-processing facilities used to observe, measure, and analyze atmospheric conditions for weather forecasting and climate monitoring.
  • C. numerical weather prediction model
    A numerical weather prediction model is a computational system that uses mathematical equations and atmospheric data to simulate and forecast future weather conditions.
  • D. meteorologist
    A meteorologist is a scientist who studies the atmosphere and uses data and models to forecast weather and analyze climate patterns.
  • E. global data-processing and forecasting system chosen
    A global data-processing and forecasting system is an integrated platform that ingests, cleans, analyzes, and models large-scale, heterogeneous data from worldwide sources to generate timely predictions and insights for decision-making.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca83ebbef881909ac47f789145fef7 completed March 30, 2026, 2:08 p.m.
Created at: March 30, 2026, 4:16 p.m.