Triple
T7755746
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Pawtucket Canal |
E175891
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | historic industrial waterway |
C3667
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: historic industrial waterway Context triple: [Pawtucket Canal, instanceOf, historic industrial waterway]
-
A.
historic infrastructure
chosen
Historic infrastructure comprises long-standing physical structures and systems—such as bridges, roads, canals, and railways—that were built in the past and continue to embody cultural, technological, and architectural significance.
-
B.
historic portage route
A historic portage route is a traditional overland path used to carry watercraft and goods between navigable waterways, often significant for its cultural, economic, and transportation history.
-
C.
historic industrial structure
A historic industrial structure is a preserved building or facility originally designed for manufacturing, processing, or other industrial activities, valued today for its architectural, technological, and cultural significance.
-
D.
historic industrial complex
A historic industrial complex is a large-scale, often multi-building site where past manufacturing, processing, or extractive activities took place, retaining significant architectural, technological, and cultural heritage value.
-
E.
historic transportation system
A historic transportation system is an organized network of vehicles, routes, and infrastructure from a past era that once facilitated the movement of people or goods and is now preserved, studied, or remembered for its cultural, technological, or historical significance.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c6996180088190832e38e8d83ff54a |
completed | March 27, 2026, 2:51 p.m. |
Created at: March 27, 2026, 4:08 p.m.