Triple

T7754338
Position Surface form Disambiguated ID Type / Status
Subject Lock 11 and Weir E175851 entity
Predicate instanceOf P0 FINISHED
Object hydraulic engineering structure C14228 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: hydraulic engineering structure
Context triple: [Lock 11 and Weir, instanceOf, hydraulic engineering structure]
  • A. engineering structure
    An engineering structure is a designed and constructed system of connected components that safely resists and transmits loads to fulfill a specific functional purpose in the built environment.
  • B. lock and dam structure chosen
    A lock and dam structure is an engineered system on a waterway that combines a gated dam to control water levels with a lock chamber to raise and lower vessels between different elevations for safe and efficient navigation.
  • C. flood control facility
    A flood control facility is an engineered structure or system designed to manage, divert, store, or reduce excess water flow to prevent or mitigate flooding in surrounding areas.
  • D. concrete dam
    A concrete dam is a massive engineered barrier constructed primarily from concrete to hold back and control the flow of water in a river or reservoir.
  • E. civil engineer
    A civil engineer is a professional who designs, constructs, and maintains infrastructure projects such as roads, bridges, buildings, and water systems to ensure safety, functionality, and sustainability.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c6996180088190832e38e8d83ff54a completed March 27, 2026, 2:51 p.m.
Created at: March 27, 2026, 4:08 p.m.