Triple

T7754290
Position Surface form Disambiguated ID Type / Status
Subject Kings Billabong Park E175850 entity
Predicate instanceOf P0 FINISHED
Object wetland reserve C3100 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: wetland reserve
Context triple: [Kings Billabong Park, instanceOf, wetland reserve]
  • A. wetland
    A wetland is a transitional ecosystem between terrestrial and aquatic environments characterized by saturated soils, standing or slow-moving water, and vegetation adapted to waterlogged conditions.
  • B. restored wetland
    A restored wetland is a previously degraded or altered wetland area that has been intentionally rehabilitated to recover its natural hydrology, vegetation, and ecological functions.
  • C. nature reserve chosen
    A nature reserve is a protected area of land or water designated to conserve wildlife, habitats, and natural features, often limiting human activities to research, education, and low-impact recreation.
  • D. wildlife refuge
    A wildlife refuge is a protected area of land or water managed to conserve native plants, animals, and their habitats while limiting or regulating human activities.
  • E. National Wildlife Refuge
    A National Wildlife Refuge is a protected area of land and water managed primarily for the conservation of wildlife, plants, and their habitats while allowing compatible public uses such as wildlife observation and education.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c6996180088190832e38e8d83ff54a completed March 27, 2026, 2:51 p.m.
Created at: March 27, 2026, 4:08 p.m.