Triple

T7744836
Position Surface form Disambiguated ID Type / Status
Subject North Anna Nuclear Generating Station E175600 entity
Predicate backupPower P10326 FINISHED
Object diesel generators LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: diesel generators | Statement: [North Anna Nuclear Generating Station, backupPower, diesel generators]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: backupPower
Context triple: [North Anna Nuclear Generating Station, backupPower, diesel generators]
  • A. maintainsPowerThrough
    Indicates that one entity preserves or secures its authority, control, or dominance by means of another entity or specified mechanism.
  • B. reservesPowerTo
    Indicates that one party retains or explicitly keeps for itself the authority or right to exercise a particular power or function, rather than granting it to others.
  • C. hasBackupBattery
    Indicates that an entity is equipped with an additional battery intended to provide power when the primary power source is unavailable or fails.
  • D. emergencyPower chosen
    Indicates that an entity has backup or auxiliary power available or activated for use during emergencies or primary power failures.
  • E. secondaryBattery
    Indicates that an entity has a secondary battery system or backup power source in addition to its primary battery.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c69960b3588190a53aa590d31d9544 completed March 27, 2026, 2:51 p.m.
NER Named-entity recognition batch_69c70402169481909b219dc5f4a64b9b completed March 27, 2026, 10:26 p.m.
PD Predicate disambiguation batch_69c7016c4a748190a7012030edaefcee completed March 27, 2026, 10:15 p.m.
Created at: March 27, 2026, 4:07 p.m.