Triple

T7732533
Position Surface form Disambiguated ID Type / Status
Subject Mun River E175295 entity
Predicate hydropowerProject P15311 FINISHED
Object Pak Mun Dam E686185 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Pak Mun Dam | Statement: [Mun River, hydropowerProject, Pak Mun Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Pak Mun Dam
Context triple: [Mun River, hydropowerProject, Pak Mun Dam]
  • A. Pak Mun Dam chosen
    Pak Mun Dam is a controversial hydroelectric dam in northeastern Thailand known for its significant social and ecological impacts on communities along the Mun River.
  • B. Baishan Dam
    Baishan Dam is a major hydroelectric and flood-control dam in northeastern China, known for its large reservoir and role in regional power generation.
  • C. Kpong Dam
    Kpong Dam is a hydroelectric power facility on Ghana’s Volta River that generates electricity and supports irrigation and water supply in the region.
  • D. Harangi Dam
    Harangi Dam is a masonry dam built across the Harangi River, a tributary of the Kaveri, in Karnataka, India, primarily used for irrigation and water storage.
  • E. Jirau Dam
    Jirau Dam is a large hydroelectric power plant in Brazil, built on the Madeira River as part of the country’s major Amazon basin energy infrastructure.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c6995e912c81909a49a2657103f786 completed March 27, 2026, 2:51 p.m.
NER Named-entity recognition batch_69c7033863d881909451a4f9675021a3 completed March 27, 2026, 10:22 p.m.
NED1 Entity disambiguation (via context triple) batch_69c8c7c12e0081908eb984ba9bc558ff completed March 29, 2026, 6:33 a.m.
Created at: March 27, 2026, 4:06 p.m.