Triple
T7722757
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Rockwell Semiconductor Systems |
E175053
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | semiconductor company division |
C22744
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: semiconductor company division Context triple: [Rockwell Semiconductor Systems, instanceOf, semiconductor company division]
-
A.
Samsung division
A Samsung division is an organizational unit within Samsung Group responsible for managing specific product lines, services, or business functions under the broader corporate strategy.
-
B.
Intel subsidiary
An Intel subsidiary is a legally distinct company that is majority-owned and controlled by Intel Corporation to support its strategic, operational, or market objectives.
-
C.
smartphone manufacturer division
A smartphone manufacturer division is an organizational unit within a company responsible for the design, production, marketing, and lifecycle management of the company’s smartphone products.
-
D.
semiconductor manufacturing facility
A semiconductor manufacturing facility is a highly controlled industrial plant where raw silicon wafers are processed through complex, precise, and cleanroom-based fabrication steps to produce integrated circuits and microchips.
-
E.
defense contractor division
A defense contractor division is an organizational unit within a defense company responsible for developing, producing, and supporting specific military or security-related products, services, or programs for government and allied clients.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c6995d541c81909eaa646b1a8369a9 |
completed | March 27, 2026, 2:51 p.m. |
Created at: March 27, 2026, 4:05 p.m.