Triple

T7722593
Position Surface form Disambiguated ID Type / Status
Subject Space Shuttle thermal protection system E175049 entity
Predicate operationalUntil P6603 FINISHED
Object 2011 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 2011 | Statement: [Space Shuttle thermal protection system, operationalUntil, 2011]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: operationalUntil
Context triple: [Space Shuttle thermal protection system, operationalUntil, 2011]
  • A. operatedUntil chosen
    Indicates that an entity continued to function or be in operation up to a specified end time or date.
  • B. usedUntil
    Indicates that something remained in use or operation up to a specified time or event, after which it was no longer used.
  • C. managedUntil
    Indicates that one entity was responsible for managing or overseeing another entity up to a specific point in time.
  • D. fullyOperationalBy
    Indicates that an entity is expected or required to be completely functional and ready for use no later than a specified time or event.
  • E. extendsUntil
    Indicates that something continues or remains in effect up to a specified point or limit in time or space.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c6995d541c81909eaa646b1a8369a9 completed March 27, 2026, 2:51 p.m.
NER Named-entity recognition batch_69c7074eca4c8190bd51fd1b450729e8 completed March 27, 2026, 10:40 p.m.
PD Predicate disambiguation batch_69c7016a6cf88190b53bf4b958f0f302 completed March 27, 2026, 10:15 p.m.
Created at: March 27, 2026, 4:05 p.m.