Triple

T7722399
Position Surface form Disambiguated ID Type / Status
Subject External Tank E175045 entity
Predicate instanceOf P0 FINISHED
Object expendable launch vehicle stage C22741 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: expendable launch vehicle stage
Context triple: [External Tank, instanceOf, expendable launch vehicle stage]
  • A. orbital launch vehicle first stage
    The orbital launch vehicle first stage is the initial propulsion segment of a rocket that provides the primary thrust to lift the vehicle off the ground and accelerate it through the lower atmosphere before separating for subsequent stages to continue to orbit.
  • B. expendable launch vehicle
    An expendable launch vehicle is a rocket designed for a single use to deliver payloads such as satellites or spacecraft into space, after which its components are discarded rather than recovered or reused.
  • C. rocket upper stage
    A rocket upper stage is the final propulsion segment of a launch vehicle, designed to operate in near-vacuum conditions to place payloads into their intended orbits or trajectories after lower stages have completed initial ascent.
  • D. expendable launch system
    An expendable launch system is a type of launch vehicle designed for a single use, where major components are not recovered after delivering payloads such as satellites or spacecraft into orbit or on a trajectory.
  • E. orbital launch vehicle
    An orbital launch vehicle is a rocket-powered system designed to transport payloads from Earth's surface into orbit by achieving sufficient velocity and altitude to remain in continuous free-fall around the planet.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c6995d541c81909eaa646b1a8369a9 completed March 27, 2026, 2:51 p.m.
Created at: March 27, 2026, 4:05 p.m.