Triple

T7717585
Position Surface form Disambiguated ID Type / Status
Subject statue of Ron Santo E174924 entity
Predicate installationContext P78316 FINISHED
Object Major League Baseball venue LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Major League Baseball venue | Statement: [statue of Ron Santo, installationContext, Major League Baseball venue]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: installationContext
Context triple: [statue of Ron Santo, installationContext, Major League Baseball venue]
  • A. installationCommand
    Indicates the command or set of commands used to install a particular software, package, or component.
  • B. installationScope
    Indicates the extent or range within which an installation is applied, managed, or affects relevant entities.
  • C. controlledInstallation
    Indicates that an entity has authoritative oversight or management responsibility over the setup, configuration, or deployment of another entity.
  • D. installationMedia
    Indicates that something serves as or is used as the medium (such as a disk, image, or package) through which a software or system is installed.
  • E. installationCompleted
    Indicates that the process of installing something has finished successfully.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c6995c463c8190a14458036249d419 completed March 27, 2026, 2:51 p.m.
NER Named-entity recognition batch_69c702ebb7448190ae8d47fe0cbb0907 completed March 27, 2026, 10:21 p.m.
PD Predicate disambiguation batch_69c701683dec8190be9861e592aa8ce0 completed March 27, 2026, 10:15 p.m.
PDg Predicate description generation batch_69c702e9a32081909a153190a62af426 completed March 27, 2026, 10:21 p.m.
Created at: March 27, 2026, 4:05 p.m.