Triple

T7707645
Position Surface form Disambiguated ID Type / Status
Subject PortMiami E174660 entity
Predicate connectedBy P37 FINISHED
Object PortMiami Tunnel E164325 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: PortMiami Tunnel | Statement: [PortMiami, connectedBy, PortMiami Tunnel]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: PortMiami Tunnel
Context triple: [PortMiami, connectedBy, PortMiami Tunnel]
  • A. PortMiami Tunnel chosen
    The PortMiami Tunnel is an underwater roadway in Miami, Florida, that diverts port-related traffic away from downtown by providing a direct connection between the MacArthur Causeway and PortMiami.
  • B. Baltimore Harbor Tunnel
    The Baltimore Harbor Tunnel is a vehicular tunnel in Baltimore, Maryland, that carries Interstate 895 beneath the harbor as a major route for traffic bypassing downtown.
  • C. East New York Tunnel
    The East New York Tunnel is a railroad tunnel in Brooklyn, New York, that carries Long Island Rail Road trains beneath the East New York neighborhood.
  • D. Havana Tunnel
    The Havana Tunnel is an underwater vehicular tunnel in Cuba that passes beneath the entrance of Havana Bay, connecting central Havana with the eastern side of the city.
  • E. O'Neill Tunnel
    The O'Neill Tunnel is a major highway tunnel in downtown Boston that carries Interstate 93 beneath the city as part of the Big Dig project.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c6995b3e8c8190833108f883d5f53c completed March 27, 2026, 2:51 p.m.
NER Named-entity recognition batch_69c702aadea08190bf827f5d51535224 completed March 27, 2026, 10:20 p.m.
NED1 Entity disambiguation (via context triple) batch_69c8acc896008190bacae1ae79498103 completed March 29, 2026, 4:38 a.m.
Created at: March 27, 2026, 4:04 p.m.