Triple

T7688160
Position Surface form Disambiguated ID Type / Status
Subject Sunshine Water Control District E174174 entity
Predicate instanceOf P0 FINISHED
Object independent special district C2259 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: independent special district
Context triple: [Sunshine Water Control District, instanceOf, independent special district]
  • A. special-purpose district chosen
    A special-purpose district is a limited-purpose local government entity created to perform a specific public function or set of functions—such as water supply, transportation, or education—within a defined geographic area.
  • B. special-purpose governmental unit
    A special-purpose governmental unit is a limited-scope public entity, such as a school district or water authority, created by law to perform a specific governmental function or set of functions within a defined geographic area.
  • C. independent regional agency
    An independent regional agency is an autonomous public or quasi-public organization that operates within a specific geographic region to plan, coordinate, and deliver specialized services or regulatory functions separate from direct control by central government bodies.
  • D. metropolitan district
    A metropolitan district is an administrative or governmental region that encompasses a central city and its surrounding urban and suburban areas, managed as a single integrated unit for planning, services, and governance.
  • E. District
    A District is a defined geographic or administrative area within a larger region, established for governance, organization, or service delivery purposes.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c6995966348190939e6c37ba272c06 completed March 27, 2026, 2:51 p.m.
Created at: March 27, 2026, 4:02 p.m.