Triple

T7685479
Position Surface form Disambiguated ID Type / Status
Subject ASME B31.8 Gas Transmission and Distribution Piping Systems E174105 entity
Predicate instanceOf P0 FINISHED
Object engineering standard C2538 CONCEPT FINISHED

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c6995840408190a19de6c51090f46f completed March 27, 2026, 2:51 p.m.
Created at: March 27, 2026, 4:02 p.m.