Triple

T7653124
Position Surface form Disambiguated ID Type / Status
Subject Hartland, Maine E173304 entity
Predicate roadAccessVia P9041 FINISHED
Object Maine State Route 23 E575017 NE FINISHED

Disambiguation candidates (1 decision)

The exact options the model was shown at each disambiguation step, with the option it chose highlighted — the evidence behind this triple's disambiguated ids.

NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Maine State Route 23
Context triple: [Hartland, Maine, roadAccessVia, Maine State Route 23]
  • A. Maine State Route 23 chosen
    Maine State Route 23 is a state highway in central Maine that connects several rural communities, including the town of Dexter, and links with other regional routes.
  • B. Maine State Route 27
    Maine State Route 27 is a primary north–south state highway in Maine that connects the capital city of Augusta with several central and western Maine communities and recreational regions.
  • C. Maine State Route 26
    Maine State Route 26 is a major north–south state highway in western Maine that connects the Portland area to the New Hampshire border, serving towns such as Gray, Oxford, and Bethel.
  • D. Maine State Route 231
    Maine State Route 231 is a state highway in Maine that serves as a regional connector route through Cumberland County, linking several local communities and major roads.
  • E. Maine State Route 32
    Maine State Route 32 is a state highway in Maine that runs through the central part of the state, connecting several rural communities and intersecting with multiple major routes.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

Stage Batch ID Job type Status
creating batch_69c6995473348190a4f41d110d619a18 elicitation completed
NER batch_69c7018c34a88190be6089a9105bd4b0 ner completed
NED1 batch_69c89af47b9c819087d42f1b01c413fe ned_source_triple completed
Created at: March 27, 2026, 3:59 p.m.