Triple
T7629020
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Plan Zuid |
E172711
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | urban development plan |
C15908
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: urban development plan Context triple: [Plan Zuid, instanceOf, urban development plan]
-
A.
urban development
Urban development is the planned growth and improvement of cities and towns through the design, regulation, and construction of buildings, infrastructure, and public spaces to support economic, social, and environmental needs.
-
B.
urban design project
An urban design project is a coordinated planning and design effort that shapes the physical form, public spaces, infrastructure, and land use of a specific urban area to improve its functionality, aesthetics, and livability.
-
C.
town plan
chosen
A town plan is a comprehensive design that organizes the spatial layout, land use, infrastructure, and public spaces of a town to guide its development and functioning.
-
D.
urban planning unit
An urban planning unit is a defined spatial or administrative area within a city used as a basic building block for analyzing, designing, and regulating land use, infrastructure, and development policies.
-
E.
town planning policy
Town planning policy is a set of rules and guidelines that shape how land is used and developed in a town to balance social, economic, and environmental needs.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c699517e348190bd3348b6889200f2 |
completed | March 27, 2026, 2:50 p.m. |
Created at: March 27, 2026, 3:56 p.m.